ISO14064-1:2018 coaching will take place in 2021, with external validation completed in 2022、2023、2024
Plan year-by-year carbon reduction plans.
Replacing older equipment to reduce carbon emissions
Continuous research and development of carbon reduction machines.
Factory equipment performance optimization:
a. Circulating water pump replacement >> high-efficiency unit and frequency conversion (ice water pump, cooling water pump, cooling water tower fan)
b. The air-conditioned ice and water zone in the factory is divided into 7 independent areas
It can save 3.26% of electricity; 82,000 kWh/year, reducing electricity bills by about 530,000 yuan/year.